Our purpose, to make your projects a success.

Our consultants and our clients work in synergy and become stronger together.

Our purpose, to make your projects a success.

Our consultants and our clients work in synergy and become stronger together.

Our purpose, to make your projects a success.

Our consultants and our clients work in synergy and become stronger together.

About us

A team at your disposal :

We support and manage your projects with the help of our experts (Turnkey project with a dedicated team and Project Sourcing by completing your team). We look forward share our experience with you, and helping you to achieve your goals.

Do you need an expert in project management?

We guide our clients at every stage of their projects: We mobilize operational consultants for them, we analyze a problem for a given mission and we train and evaluate the teams in place. We also can manage your project from A to Z. 

Do not hesitate to contact us.

Our missions: the areas in which we excel

Project management

Project management from A to Z / PMO / PMI certified

Schedule management

Expertise in planning with different tools, Primavera, MS project ...

Cost management

Control and track costs by earned value and other methods.

Risk management

Identify and monitor risks, Valuing risks, Defining countermeasures.

Document quality and management

Standardization of project management tools and procedures, Document management (GED).

Our teams

Our project managers, project engineers, planners and budget controllers support you from the start of the activities. Our managers and engineers carefully monitor quality, planning and budget, without losing sight of the atmosphere within the team.

Experiences, Knowledge & Relational Skills

Experiences

NORD - Dunkerque (59)

ARCELOR MITTAL

Business Manager Coating tower (Coating room, coating preparation plant, Inductors, Cooling) - Construction project

Construction project of a new production line for “electric” steels, intended for electrified car. Production capacity of 200,000 tons of steel per year, with a budget of 300 million euros and about twenty companies involved.

Nature of the mission : Varnishing tower lot manager, Tender, clarification, Award, Business management and monitoring of basic and detailed engineering, Monitoring and coordination of the construction, Preparation and supervision of the commissioning, Reporting, progress meeting, and KPIs.

NORMANDIE - Alizay (27)

ProServ International GmbH & Co. KG

Site Manager : Project to dismantle a Paper Cutter Line (Double A)

Dismantling of Double A paper machine factory on behalf of Proserv International, in order to send it to Turkey for the company Ve-ge.

Nature of the mission: Site manager dismantling, Coordination and monitoring of work of the stakeholders and their limitation of services, Site management in safety, Control of the execution of the operations performed, Completion and verification of technical and administrative documents (transfer of risks and responsibilities), Completion and maintenance of safety documents (Prevention Plan, TA, fire permit, handling sheet), Writing of reports (Safety, Quality, Costs, Deadlines), Facilitation of advancement meetings.

NORMANDIE - Alizay (27)

INOVA PULP & PAPER

PMO - Projet DIP : Construction of a paper recycling plant

Inova Pulp & Paper is a recycling plant located in Alizay in the Eure department in Normandy which transforms “used paper” into “de-inked paper pulp” giving them a second life. For an estimated cost of 28 million euros.

Nature of the mission: Management and preparation of the project budget, cash flow control, development and monitoring of planning and budget, KPIs and reporting.

ÎLE-DE-FRANCE - Paris (75)

RATP – Symphonie SSI Project

PMO - Symphonie SSI project: Equip metro stations with a centralized fire system

The SYMPHONIE SSI project aims to provide the RATP with centralized fire safety monitoring resources for its metropolitan network, rith an estimated cost of 35 million euros.

Nature of the mission: Management of companies and subcontractors, planning and budget monitoring, KPIs and reporting.

ÎLE-DE-FRANCE

RÉSEAU SNCF – CDG Express

PMO - Build a “CDG Express” line between CDG Airport and Paris-Gare de l'Est

The CDG Express is a direct rail link project, connecting Paris-Charles de Gaulle airport to Paris-Gare de l’Est in 20 minutes, every ¼ hour, from 5 am to midnight. It will be put into service in early 2027. Its ambition is to meet the needs of air travellers. At an estimated cost of 2.2 billion euros.

Nature of the mission: Procurement strategy and allotment in several markets, monitoring of deliverables, launch of contracts and financial eligibility study.

 

 

 

ÎLE-DE-FRANCE

EDF – CETAC

Project Manager in charge of unit outages - maintenance of combustion turbines

The Combustion Turbine Operations Center (CETAC) has 13 production units, for a total power of 1920 MW, and operates with light fuel oil or gas. Built between 1980 and 2010, the 13 units are an important component in the production of electricity in France.

Nature of the mission: Management of shutdowns for preventive maintenance one month/turbine/year.

ÎLE-DE-FRANCE - Montevrain (77)

EDF – UTO Montevrain

Project engineer - Renewal of cooling piping maintenance contract for 6 CNPE nuclear power plants.

Redo a contract, call for tenders, analysis of technical and financial admissibility, award of the contract. For a cost or a target value of 8 million euros.

AUVERGNE-RHÔNE-ALPES - CIH Livet (38)

EDF – CIH Romanche Gavet

PMO - Construction of a hydraulic power station

Replacement of 6 power stations and 5 old dams by 1 new dam and 1 new power station, more efficient (+40% production on the same stretch of river), safer and more respectful of its environment. With a power of 97 megawatts (MW), the Gavet hydropower plant has a production capacity of 560 million kWh/year (41 million euros invested in this project).

Nature of the mission: Coordinate and plan all construction work for the hydroelectric power plant.

AUVERGNE-RHÔNE-ALPES - Grenoble (38)

ALSTOM Hydro 2.0

OPC for the Alstom industrial site renovation project in Grenoble

On nearly 150,000 m2, Alstom is renovating the Grenoble site which houses the world center for hydraulic turbine technology, the various project activities (commercial, management, turbine engineering, regulation and services), production of hydraulic turbines and general activities (finance, human resources and quality).

Nature of the mission: Demolition, construction, renovation, asbestos removal, etc.

AIN - Sainte-Julie (01)

Plastic Omnium – ∑-Sigmatech

Innovation Project Manager - Packaging and shielding of batteries for electric cars (Renault Zoe)

Management of an innovation project at the R&D center of plastic omnium: Sigmatech, on the electromagnetic compatibility (EMC) of battery packs for electric cars.

Nature of the mission: It was to find solutions and materials for electromagnetic shielding, also to ensure their feasibility and their integrability at Plastic Omnium, but also to assess the investment necessary to meet these needs; while committing to the competitiveness of the price and the lightness of the solution.

Our references